Network Rail: South East Engineering Works
Social Creative Production
Closure notices for Network Rail’s South East upgrade schemes, animated from supplied storyboards and recomposed for each placement: Stories (9:16), in-stream (1.91:1) and Teads (16:9).
- Production scope
- Motion, Paid Social Production
- Brand
- Network Rail
- Work shown
- 4 messages · 3 formats · 8 films
Nine-day line closure, Maidstone East to Ashford International.

The campaign
Engineering works on the South East network meant line closures and rail replacement buses, and each one had to be announced quickly wherever passengers would see it. The agency supplied a storyboard and artwork for each scheme, built around one engineer character; each was animated and recomposed for the placements it was briefed for: 9:16 Stories, 1.91:1 in-stream and 16:9 Teads.
One message, every size
The featured message in all two of its sizes.
Films 2

1200×628 
1080×1920
All 8 creatives
Four messages across three sizes; not every message was made in every size. 8 films.
Nine-day line closure, Maidstone East to Ashford International. 2 sizes, the featured message

Nine-day line closure, Maidstone East to Ashford International.1200×628 
Nine-day line closure, Maidstone East to Ashford International.1080×1920
Weekday line closures, Southampton Central to Bournemouth. 2 sizes

Weekday line closures, Southampton Central to Bournemouth.1200×628 
Weekday line closures, Southampton Central to Bournemouth.1080×1920
Line closures, Tunbridge Wells to Hastings. 2 sizes

Line closures, Tunbridge Wells to Hastings.1200×628 
Line closures, Tunbridge Wells to Hastings.1080×1920
Line closures affecting all trains via Southampton. 2 sizes

Line closures affecting all trains via Southampton.1280×720 
Line closures affecting all trains via Southampton.1080×1920
Nothing matches both filters.
The production challenge
- One storyboard, several shapes: the in-stream films set the headline large across the frame with the character beside it; the Stories films move the headline into the middle third and anchor the character at the bottom, clear of the top and bottom bands.
- Burst after burst: the same character system re-run for each scheme with new routes, dates and colourways.
- Dates and routes that change between versions: Southampton Freight was made in versions for two closure dates.
How it was built
- Animated in After Effects from the supplied storyboards and artwork, recomposed for each placement rather than cropped from one master.
- Exported to each placement’s spec: 10-second Stories and in-stream films for Bearsted, Southampton and Hastings, 15-second Stories and Teads films for Southampton Freight.
Four schemes, each told in the shape of the placement it was made for.
What’s shown
- One Stories and one in-stream (or Teads) film per scheme, shown muted. The dates are part of the original artwork.
- The Bearsted Stories film was delivered for both Facebook and Instagram Stories as the same file, so it is shown once.
Credits
- Social production: Punk My Pixel (the animation and export of every placement)
- Creative: Supplied